Manufacturing Capacity Calculator
Effective capacity
120.0000
Production Capacity Calculator
Design capacity at 100% utilisation
160.0000
Effective capacity per resource
60.0000
Effective capacity per hour
15.0000
Output lost to utilisation below 100%
40.0000
Worked out from Researched engineering contract R3612: capacity = resources x rate x hours x utilisation and 2 other sources.
Capacity here is a planning figure. It assumes the resources are interchangeable and independent; a line of dependent stations is limited by its bottleneck instead.
How this is worked out
4 steps
- Design capacity = 2 resources x 10 per hour x 8 hours = 160 units.
- Effective capacity = 160 x 0.75 utilisation = 120 units, so 40 units of capacity are absorbed by downtime.
- No demand given, so no coverage figure.
- No setup times given.
Results are general information, not financial, tax, legal, medical or engineering advice.