Labels Calculator
Total project cost
12.43
Project Material Calculator
Total material cost
12.43
Material cost per piece
12.43
Labour cost
0
Total cost per piece
12.43
Waste allowance applied
10 %
Number of materials
4
Default unit for this craft
units
Worked out from Bill-of-materials arithmetic: required = per-unit quantity x units x (1 + waste); packs = ceil(required / pack size)..
How this is worked out
7 steps
- General craft project: 4 materials for 1 finished piece(s).
- Each material's requirement is multiplied by 1 and increased by 10% for waste.
- Material A: 100 each x 1 + waste = 110 = 5.5
- Material B: 2 each x 1 + waste = 2.2 = 2.64
- Material C: 1 each x 1 + waste = 1.1 = 3.85
- Material 4: 4 each x 1 + waste = 4.4 = 0.44
- Total material cost 12.43 = 12.43.
Bill of materialstable
| material | perPiece | requiredWithWaste | inStock | toBuy | packsToBuy | purchased | unitCost | lineCost |
|---|---|---|---|---|---|---|---|---|
| Material A | 100 | 110 | 0 | 110 | 110 | 0.05 | 5.5 | |
| Material B | 2 | 2.2 | 0 | 2.2 | 2.2 | 1.2 | 2.64 | |
| Material C | 1 | 1.1 | 0 | 1.1 | 1.1 | 3.5 | 3.85 | |
| Material 4 | 4 | 4.4 | 0 | 4.4 | 4.4 | 0.1 | 0.44 |
Results are general information, not financial, tax, legal, medical or engineering advice.