Tree Removal Cost Calculator
Total with contingency
750.00
Construction Cost Calculator
Materials with waste and tax
0.00
Labour
0.00
Direct cost
750.00
Overhead
0.00
Profit
0.00
Cost before contingency
750.00
Contingency amount
0.00
Worked out from AACE International Recommended Practice 10S-90, Cost Engineering Terminology (definitions of direct cost, indirect cost, overhead, profit and contingency) and 2 other sources.
No contingency is carried. Renovation scopes almost always grow once demolition exposes what is behind the finishes.
This is an estimate built from the rates you entered, not a quote and not a bid. Real project costs depend on scope, site conditions, local labour markets, permits and what is found once demolition starts. Get written quotes before committing.
How this is worked out
2 steps
- Direct cost = 750
- Contingency = 750 x 0 / 100 = 0; total = 750 + 0 = 750
Results are general information, not financial, tax, legal, medical or engineering advice.